Another investment is behind us. This time the project included supplying loading systems to the REX-BUD CLM logistics center in Lućmierz.

The facility has 60 hydraulic dock levellers with swing lip type PS. In addition, there were mechanic dock shelters PMV, wheel guides, buffers  with a cover plate, halogen lamps and labeling cassettes at the reloading stations. The project also included the delivery of 60 ISO gates, one drive-in and one technical gate.

This is another large investment carried out by PROMStahl in recent times.